11.30.08
GeShiDoMo recap
A point-by-point look at the projects I started with:
1. Must Have Cardigan – I’m in the exact same spot I was in on 11/1. No progress whatsoever in the last 30 days. Maybe in December.
2. Pi Shawl – nearly finished, but I ran out of yarn. I’ve contacted the dyer about getting more yarn in that colorway, but I haven’t heard back from them. I’ll rip out the portion of the border I’ve already completed, and do another repeat if I can get more.
3. Poisoned Waffles Socks – Completed 11/1.
4. Helical Stripe Socks - Much progress on the second sock. I’m about 2/3 done, just plugging away at the stockinette foot. Shouldn’t be long now.
5. Lost Socks – restarted on 11/23. Nearly done with the 1st leg.
6. Hermione’s Purse Socks – working on the gussets of both socks.
Clapotis – No progress. Back in the sleeping pile with this one.
So, overall, some progress. Not as much as I wanted, but it was a month from hell.
December holds 3, possibly 4, Christmas projects: socks for a friend studying overseas, a bathmat for my aunt, mittens for my grandma, and socks possibly for S. I’ve already picked out the yarn and I’m improvising a pattern for the friend’s socks, I’ll start as soon as I finish a pair on the needles, because I need the needles!





